Industry
Power and energy
- Power plants
- Substations
- Energy distribution
Power generation is a prime target, but a structured, risk-based OT program can reduce the danger significantly.
- Operators that fail to meet the regulations can be fined or lose their license.
- NIS2CISA
- protocol family used in substation automation
- IEC 61850
- how long protection relays stay in service
- 20–25years
The challenge
Cybersecurity challenges
Cyber risks to OT systems in this sector are growing.
Who attacks the sector
Nation-state actors, criminals after financial gain, and hacktivists.
What expands the attack surface
Network convergence, wide geographic spread, and low OT maturity.
Loss of supply and physical damage
A compromised OT system can shut down the power supply and can also cause physical damage (for example, by driving a wind turbine into overspeed).
Solution
Industry risk management
Where the OT security program has gaps, we recommend building it in two stages.
-
Risk discovery and prioritization
Phase 1
The first step is to identify the critical OT functions (generators, switching stations) and assess what happens if they go down. Realistic attack scenarios need to be worked through with the system operators, and the network, user privileges, supply chains, and physical security need to be mapped.
-
OT cybersecurity framework (OT-CSF)
Phase 2
Formal policies and procedures need to be put in place, built on the standards below. Typical elements of the framework: a governance model (RACI), an end-to-end operating model, regulatory compliance, an asset register, network topologies, and an incident response plan.
Related OT services
Relevant OT services
These are the services that fit the OT risks of this industry best.
All OT servicesOT security assessment
Shows what is on the OT network and what talks to what; at full depth it also analyzes the attack paths.
OT network segmentation
Splitting a flat OT network into zones so that an attack cannot spread from one compromised device to the whole plant.
OT incident response protocol
An OT-specific procedure and playbooks, with a tabletop exercise.
Power sector specifics
What is different here
OT environments in the power sector differ fundamentally from other industrial environments in a few ways, and those differences decide where the project puts its emphasis.
-
Real-time requirement
Why it matters
GOOSE messages tolerate latency only on the order of milliseconds.
What it means for the project
Active scanning is ruled out; passive methods only.
-
Distributed sites
Why it matters
Many substations, often unattended.
What it means for the project
The remote supervision channel is the main risk.
-
Physical security
Why it matters
Physical access to the substation is an attack vector too.
What it means for the project
Access control and logging are brought into scope.
-
Impact of an outage
Why it matters
The impact reaches beyond the company itself.
What it means for the project
A higher Security Level is justified.
The process
OT security in the power sector
Substation automation and remotely supervised sites come with risks of their own.
-
Passive discovery at substations
We identify the IEDs and protection relays by analyzing IEC 61850 GOOSE and MMS traffic.
-
Zoning by voltage level
The station level, bay level, and process level of the substation are separate zones.
-
Protecting remote supervision
We protect the link between the control center and the sites with MFA, an encrypted channel, and on-demand activation.
-
Continuity plan
We document how the sites can be run locally if remote supervision goes down, and in what order the system is brought back.
Deliverables
What you get at the end
items handed over
- Asset inventory per substation: IEDs, protection relays, RTUs, firmware versions
- IEC 61850 traffic analysis and communication matrix
- Zone plan by voltage level and function
- Remote supervision architecture
- Vulnerability report on protection and control devices
- Compensating controls for IEDs that cannot be updated
- Incident response procedure agreed with the control center
- Priorities for the next 12–18 months
Frequently asked questions
The questions we hear most
Can the assessment disrupt substation operations?
No, because we work with passive methods only. The TAP used for traffic mirroring is installed in the switch cabinet without touching the protection chain.
Why start with the remote supervision link?
The channel between the control center and the sites was often built years ago, on assumptions that no longer hold: internet instead of a dedicated line, no encryption, single-factor authentication. This is where an attacker can reach several sites at once.
How do we handle protection relays that are 20–25 years old?
Most of them cannot be patched, so we work in three layers: a strict zone boundary, so they can be reached only from where it is strictly necessary; network-level virtual patching for known vulnerabilities; and continuous monitoring. These devices communicate very predictably, which makes deviations easy to spot.
Does it require a substation outage?
Not for the assessment or the design. Enforcing the segmentation needs a short window per zone, which we fit into the existing maintenance schedule. With several substations we proceed in stages, and what we learn at the first one shortens the rest.